Remoulded specimen: The test material
should pass 19mm IS sieve and retained on
4.75mm IS sieve. The dry density for a
remoulding shall be either the field density or
the value of the maximum dry density estimated
by the compaction test, Heavy Compaction
Test as per IS-2720 (Part-8):1983, for Railway
Formation. The water content used for
compaction shall be the optimum water content
or the field moisture as the case may be.
(ii) Dynamic Compaction: A representative
sample of the soil weighing approximately 4.5
kg or more for fine grained soil and 5.5 kg or
more for granular soil shall be taken and mixed
thoroughly with water. If the soil is to be
compacted to the maximum dry density at the
optimum moisture content, the exact mass of
the soil required shall be taken and the
necessary quantity of water added so that
the water content of the soil sample is equal
to the determined optimum moisture content.
(iii) Fix the extension collar and the base plate to
the mould. Insert the spacer disc over the
base. Place the filter paper on the top of the
spacer disc.
(iv) Apply Lubricating Oil to the inner side of the
mould. Compact the mix soil in the mould using
heavy compaction i.e. compact the soil in 5
layers with 55 blows to each layer by the 4.89
kg rammer.
(v) Remove the extension collar and trim the
compacted soil carefully at the level of top of
mould, by means of a straight edge. Any holes
developed on the surface of the compacted
soil by removal of the coarse material, shall bepatched with the smaller size material. Remove
the perforated base plate, Spacer disc and
filter paper and record the mass of the mould
and compacted soil specimen. Place a disc of
coarse filter paper on the perforated base plate,
invert the mould and compacted soil and clamp
the perforated base plate to the mould with
the compacted soil in contact with the filter
paper.
(vi) Place a filter paper over the specimen and place
perforated plate on the compacted soil specimen in the mould. Put annular weights to produce a surcharge equal to weight of base material and pavement, to the nearest 2.5 kg.
(vii) Immerse the mould assembly and weights in a
tank of water and soak it for 96 hours. Mount
the tripod for expansion measuring device on
the edge of the mould and record initial dial
gauge reading. Note down the readings every
day against time of reading. A constant water
level shall be maintained in the tank throughout the period.
(viii)At the end of soaking period, note down the
final reading of the dial gauge and take the
mould out of water tank.
(ix) Remove the free water collected in the mould
and allow the specimen to drain for 15 minutes.
Remove the perforated plate and the top filter
paper. Weigh the soaked soil sample and record
the weight.
टिप्पणियाँ
एक टिप्पणी भेजें